MRP / In-House MRP

In-House MRP - Domain Invariants & Business Rules

The immutable business laws governing In-House Manufacturing, material reservation, routing sequence, yield integrity, and production ledger immutability.

Domain Invariants & Business Rules (“The Law”)

The In-House Manufacturing domain enforces a strict set of business invariants. These rules are non-negotiable constraints that protect production integrity, cost accuracy, and auditability across the enterprise.


1. Pre-Production Material Reservation

A Manufacturing Order or Work Order cannot transition to “In Progress” until all critical raw materials and components required by the approved BOM have been successfully allocated, reserved, or hard-staged in the target production location.

Reservation Rules

RuleInvariant
Critical Component AllocationEvery BOM line flagged as critical must have confirmed allocation before production starts.
Allocation SourceAllocation may come from available inventory, expected inbound receipts, or approved floor-stock replenishment.
Hard Staging RequirementFor high-value, serialized, or lot-controlled components, physical staging to the production location is mandatory.
Non-Critical ToleranceNon-critical or floor-stock components may be backflushed, but their BOM quantities must still be covered by available stock.
Reservation LockAllocated inventory is reserved exclusively to the order and cannot be reallocated to another order without explicit release.

Business Consequence

If reservation fails, the order remains in a Material Shortage or Awaiting Staging state. Planning must either:

  • Revise the order quantity or schedule.
  • Trigger Procurement to expedite inbound material.
  • Substitute the component using an approved alternate BOM line.

2. Routing Sequence Enforcement

Routing operations must be executed in the strict sequence defined by the engineering routing unless an operation is explicitly configured to allow parallel execution or overlap.

Sequence Rules

RuleInvariant
Strict OrderingOperation $N+1$ cannot report completion until Operation $N$ has been completed or explicitly released.
Parallel Execution FlagOperations marked with the parallel flag may overlap with adjacent operations, subject to capacity constraints.
Skip AuthorizationSkipping an operation requires documented authorization, quality waiver, or engineering deviation.
Rework Re-EntryA failed operation must be corrected through a rework path that re-enters the routing at the appropriate step.

State Gate

An operation’s status acts as a gate for subsequent operations:

Operation 10: Not Started → Started → Completed
                │
                ▼ (gate opens only on Completed)
Operation 20: Not Started → Started → Completed
                │
                ▼
Operation 30: Not Started → Started → Completed

3. Non-Negative Production Yield

All recorded production quantities must satisfy physical and mathematical integrity constraints.

Yield Integrity Rules

RuleInvariant
Non-Negative QuantitiesProduced quantity, scrapped quantity, and rework quantity can never be negative.
Output CapTotal reported output (Good Quantity + Scrap Quantity + Rework Quantity) cannot exceed the order quantity plus authorized overproduction tolerance.
Material BalanceTotal material consumption must balance against total output within the tolerance defined by scrap factors and measurement units.
By-Product AttributionBy-product and co-product quantities must be explicitly attributed to a producing operation and order.

Tolerance Control

Tolerance TypeControl
OverproductionA configurable percentage above the order quantity; requires authorization beyond the threshold.
Scrap FactorApplied to gross material requirements; actual scrap above the factor triggers variance analysis.
Measurement Unit ConversionAll quantity balances respect unit-of-measure conversion factors between BOM, inventory, and reporting units.

4. Immutable Production Ledger

Once a Manufacturing Order is Completed and Closed, its consumption ledger, labor logs, machine hours, output quantities, and cost distribution are sealed permanently. Corrections require compensating adjustment orders rather than mutation of the original record.

Immutability Rules

RuleInvariant
No Post-Closure EditingMaterial issue lines, labor tickets, operation completions, and output records cannot be edited after closure.
No DeletionProduction records are never deleted; correction is achieved through compensating documents.
Sealed Cost DistributionStandard and actual costs are frozen at closure; variances are reported but not retroactively adjusted.
Audit ChainEvery compensating order links back to the original order through a reference chain.

Permitted Correction Mechanisms

Correction ScenarioMechanism
Under-issued material discovered after closureCreate a Material Adjustment Order or debit the next production run with traceable reference.
Over-issued materialCreate a Material Return Order or adjust through inventory write-off with reason code.
Labor time errorCreate a Labor Correction Ticket or apply to a subsequent order with variance note.
Output shortfall or excessCreate a Rework Order or Scrap Disposal Order referencing the original MO.
Cost misclassificationFMS posts a manual journal adjustment; Manufacturing does not alter the production ledger.

5. Capacity & Calendar Integrity

A work center or machine cannot be scheduled beyond its effective capacity within a calendar period.

Capacity Rules

RuleInvariant
No Overload SchedulingConfirmed load cannot exceed effective capacity unless explicitly overridden by authorized capacity expansion.
Calendar ValidityOperations cannot be scheduled outside the active work center calendar.
Maintenance LockoutOperations cannot be scheduled during planned maintenance windows reported by CMMS.
Skill MatchingOperations requiring specific labor skills cannot be assigned to unqualified operators.

6. Quality Gate Enforcement

Mandatory inspection operations must be completed and dispositioned before downstream operations or inventory transfers can proceed.

Quality Gate Rules

RuleInvariant
Inspection HoldOutput from an inspection-required operation remains in quarantine until dispositioned.
Disposition OutcomesOnly accepted quantities may proceed; rejected quantities are routed to scrap or rework.
Downstream BlockNo subsequent operation or GRN may be recorded until the inspection gate is released.
TraceabilityInspection results are linked to the operation, lot, and operator for full traceability.

7. Cost Object Consistency

All production costs must be attributable to a valid cost object (Manufacturing Order, Work Order, or operation) and must follow the defined cost accumulation model.

Cost Rules

RuleInvariant
No Orphan CostsMaterial issues, labor tickets, and machine hours must reference an active or closed production order.
Standard Cost ValidityStandard costs used for planning must be derived from the currently effective BOM revision and routing.
Single Cost VersionOnly one standard cost version is active for costing purposes at any point in time.
WIP Balance IntegrityThe WIP balance for an order must equal the sum of issued materials, labor, and absorbed overhead minus completed output valued at standard cost.

8. Summary of “The Law”

InvariantViolation Consequence
Material must be reserved before production starts.Order cannot be released; planning exception raised.
Operations must follow routing sequence.Subsequent operation blocked; quality deviation required.
Quantities cannot be negative and must balance.Transaction rejected; variance investigation triggered.
Closed orders are immutable.Compensating order required; original ledger protected.
Capacity cannot be overloaded without authorization.Scheduling conflict; order remains unscheduled.
Inspection gates must be cleared.Output quarantined; downstream operations blocked.
Costs must belong to a valid cost object.Cost posting rejected; orphan cost report generated.

These invariants collectively ensure that the In-House Manufacturing domain remains the authoritative source of truth for internal production execution while preserving auditability, cost accuracy, and operational control.